5Chips PCBA desk
PCBA Assembly Through Partner Factories
5Chips coordinates component procurement and PCBA assembly through manufacturing partners. Share your BOM, quantity and application so we can review the parts, assembly work and inspections your project needs.
Our manufacturing partners
Assembly support through multiple partner factories
5Chips works with multiple manufacturing partners for PCBA assembly. We help connect your component requirements with the proposed build, so the parts, assembly work and inspection needs can be reviewed together.
Component procurement
Send your BOM with full manufacturer part numbers, quantities and approved alternatives. We review the component sourcing needs alongside the assembly project.
Partner-factory production
Discuss SMT, through-hole assembly, soldering, functional checks and packaging for your board. The manufacturing partner carries out the agreed production work.
Inspection and records for your build
Tell us which inspections and production records your project needs. We can review them with the manufacturing partner as part of the build plan.
Assembly quality records
Quality documents for your assembly project
We can review your inspection and traceability requirements with the manufacturing partner before production.
Tell us which documents you need with the finished assemblies, including any batch references or inspection records.
A look at assembly, soldering and inspection work at a partner factory. For your project, use the build requirements below to discuss the processes and checks you need.
Define the work before quoting
Plan the assembly process and the checks
Your PCBA project may call for SMT and through-hole assembly, conformal coating, or final assembly and packaging. We review your board, materials and application with a manufacturing partner to plan the required work.
Material identity and build setup
Identify the approved BOM revision and the material lots for the work order. Include incoming checks, moisture-sensitive material handling and verification that loaded parts match the BOM. Tell us which batch and work-order records you need to retain.
First article, solder paste and optical checks
A first-article review checks the initial assembly before the production run. Solder paste inspection (SPI) examines printed deposits before placement; automated optical inspection (AOI) checks visible placement and soldering features. Functional testing and component identity checks answer different questions.
Hidden joints and operating conditions
For BGA or other hidden joints, ask about X-Ray inspection and the coverage your board needs. Share test instructions for functional checks, powered aging, temperature/humidity or vibration screening, including samples, conditions and acceptance criteria.
Rework, packing and shipment records
Specify how repair actions and follow-up checks should be recorded. Link finished assemblies and packaging labels to the work order or batch, and identify the inspection and packing records you need with shipment.
Tell us which inspections and records your project requires so we can agree the build plan with the selected manufacturing partner. The final plan sets out the work and checks included.
Information to include in your assembly request
| Project input | What to share |
|---|---|
| BOM and build revision | Current BOM revision, full manufacturer part numbers, packages, quantities and approved alternatives; identify any customer-supplied materials. |
| Board and assembly files | Board information, placement data and assembly drawings where available. Identify revisions and any files that will need a separate handover. |
| Process and finish | SMT or through-hole work, soldering requirements, conformal coating and masking areas, plus any enclosure assembly or packaging instructions. |
| Test and acceptance plan | Required checks, functional test instructions, fixtures, sample quantities and pass/fail criteria. Flag hidden-joint X-Ray or environmental screening for assessment. |
| Records and delivery | Required lot or work-order links, inspection and rework records, labels, packing requirements and delivery destination. |
| Quantity and schedule | Prototype or production quantity, forecast, target dates and known constraints. Capacity, MOQ and lead time are confirmed for the specific project. |
Prepare your PCBA request
Tell us about your assembly project
Describe the intended assembly scope and application. Share a BOM or part list, quantity or forecast, schedule and known production constraints where available.
You can start before every detail is settled. Use the notes field to flag missing information or additional engineering files you need to share.
Attach one file up to 20 MB: CSV, XLS, XLSX, PDF, JPG, JPEG or PNG. ZIP and RAR archives are not accepted. If you have more files, tell the team what you need to send.
Connect the assembly plan to the parts you need
Use the component sourcing route if your request is for parts only. For independent laboratory testing, define the device, samples and question before arranging a test plan.
